Tahoma Transportation Center

The Tahoma Transportation Center project was divided into two phases. The first phase consisted of major site work including land clearing, grading, storm, septic and water systems, asphalt paving, security fencing, and electrical work. The second phase included the addition of a maintenance building and a separate dispatch building.

The maintenance building is constructed of an engineered metal and contains a recycled water bus wash system, parts shop, and maintenance bays for buses. The dispatch building is wood frame construction and includes a driver’s lounge, offices, and central dispatch room.

Tahoma School District

Maple Valley, WA

COMPLETED 2009

New Construction

9,487 SF (Bus Area)
3,651 SF (Dispatch)

3.6 M (in two phases)